• 350mm max tube diameter.
• 20mm max wall.
• Minimum tube 30mm diameter.
• 2mm minimum wall.
• 7.5m max tube length.
• 500kg max tube weight. The ability to offer heavy wall pipe and large diameter cutting, with the addition of a bevel head, offers the perfect combination for structural frameworks and pipe arrangements in the oil and gas sector. The assurance that the piece parts are accurate to 0.25mm dimensionally, the correct weld prep angles and size with the accurate connection shapes already cut, removes the need for hours of labour and inaccurate pipe preparation.
________________________________________________________________________________________________________________________
figure investments into these facilities in order to further establish ourselves as the number one choice for corrosion and anti-fouling systems.”
In alignment with this significant growth, OES Group has been taking on some major projects within the renewable energy sector. One particularly exciting venture has been in collaboration with Baltic Power to support a suitable corrosion protection plan to safeguard Poland’ s first offshore wind farm foundation.
“ For this project, OES have designed, supplied and installed our market-leading ICCP systems,” Rob reveals.“ The project utilizes our market-leading Impressed Current Cathodic Protection system to protect the submerged foundations from corrosion. External anodes are installed at two levels on the TP, and, on the MP, we installed a specially designed anode ring due

PROUD

CABLE SUPPLIER TO OES
MARINE INDUSTRIAL AEROSPACE CUSTOM
Amokabel AB Kabelvägen 5 SE-364 43 Alstermo SWEDEN
+ 46 481 508 80 amokabel. com

TUBE LASER

Bodor T350 6KW Bevel Head

• 350mm max tube diameter.

• 20mm max wall.

• Minimum tube 30mm diameter.

• 2mm minimum wall.

• 7.5m max tube length.

• 500kg max tube weight. The ability to offer heavy wall pipe and large diameter cutting, with the addition of a bevel head, offers the perfect combination for structural frameworks and pipe arrangements in the oil and gas sector. The assurance that the piece parts are accurate to 0.25mm dimensionally, the correct weld prep angles and size with the accurate connection shapes already cut, removes the need for hours of labour and inaccurate pipe preparation.

www. hqfab. co. uk

e: info @ hqfab. co. uk | t:(+ 44) 0191 420 2019

124