PARTNER CONTENT
________________________________________________________________________________________________________________________
“ We’ ve also converted part of a fabrication costs by 50 percent and project warehouse in Sterling into dedicated timelines by 65 percent compared to most office space for four chemical engineers. chemical manufacturing companies. Three offices have been designated for the“ We’ ve also successfully completed managers of engineering and fabrication, the fabrication and start-up of a new as well as our head of maintenance. imidazoline process reactor, thereby This new workspace supports increased more than doubling current capacity. design and process engineering
The imidazoline we manufacture is of efficiency and provides a centralized substantial quality, and the reactor was location for expanding our chemical immediately used to assist with high reaction capabilities on-site. demand. We are also 30 percent complete
“ Connected to the new engineering on the build-out of a chemical reaction offices, we’ ve added a 6900-squarefoot fabrication facility to support the manufacture another chemical reaction
system that will allow the facility to
growth of our internal fabrication for all intermediate in large quantities. This new and existing chemical reactions reactor, at over 6000 gallons, is over operations,” he adds.“ The proximity of the triple the size of the average chemical engineering and fabrication teams allows reactor at the facility and will allow for for a direct and efficient collaboration significant cost savings with current not standard in the industry. Doing this high selling products at both the Sterling work in-house decreases design and and Gardendale facilities.
68